Chennai Power Cut On February 7, 2025: TANGEDCO Announces Shutdown In 110 Localities — Details


Chennai Power Cut On February 7, 2025:  Chennai residents are set to experience a power shutdown on Friday, February 7, as the Tamil Nadu Generation and Distribution Corporation (TANGEDCO) will undertake maintenance work across several parts of the city. The power cut is expected to last from 9 AM to 2 PM.

The affected areas include Nolambur, Siruseri, Sothuperumbedu, Kavanur, Ayapakkam, Manapakkam, and Thiruverkadu, as per a report on Live Chennai. Here is a breakdown of the specific 110 localities that will face the power outage:

Power cut in Manapakkam

RE Nagar 5th to 9th Street

Krishna Nagar

Duraisamy Nagar

Ramakrishna Nagar Annex

Part of Kundrathur Main Road

Siddharth Apartment

Ayapakkam

TNHB Ayapakkam (Plot No. 1 to 8,000)

VIP Box

Kottaimedu

Kollakala Camp

Raja Ammal Nagar

Kamarajar Nagar

St. PT College Road

TNHB 608 Flats

Kavanur

Sirukalathur

Kelithpettai

Nandambakkam

Periyar Nagar

Anjugam Nagar

Malayambakkam

Kundrathur

Bazzar Street

Metha Nagar

Manancherry G Square

Sothuperumbedu

Giruthalapuram

Budhur

Arumanthai

Vichoor

Mettupalayam

Kandigai

Vellivoyal

Siruseri

Hiranandhini Apartment

Olympia Apartment

Navallur

Siruseri Sipcot IT Park (Complete Area)

Thalambur

OMR Road

Sipcot

Pudupakkam

Arihant Apartment

Vaniyamchavadi

Kazhipattur

JJ Nagar

Muthama Nagar

Anand Engineering College

Srinivasa Nagar

Padur

Power cut in Thiruverkadu

Devi Nagar

Bakyalakshmi Nagar

Puliambedu Periya Theru

Noombal Main Road

PH Road

Aishwarya Garden

Ponniamman Nagar

Rajan Kuppam

Metro City Phase 1

VGN Mahalakshmi Nagar

Yadaval Street

Perumal Koil Street

Padasali Street

Chennai New City

Rajiv Gandhi Nagar

Chetty Main Road

Melayanambakkam

Padavattuamman Koil Street

Eden Avenue

Vijaya Nagar

Saraswathy Nagar

Srinivasa Pillai Street

Pachiappan Nagar

Konrajkuppam

Lotus Avenue

Nova

RDL Nagar

Koladi

Nolambur Power Shutdown 

SP Garden

VGN Monte Carlo

SRR Nagar

Raja Garden Area

Guru Samy Road

Nolambur Phase 1 to 2

Union Road

VGN Nagar Phase 1 to 4

1st to 8th Block

Kambar Salai

Kavimani Salai

Bharathi Salai

Annamalai Avenue

Meenakshi Avenue

Reddy Palayam Avenue

MCK Layout

MGR University

Panan Solai Street

Madha Koil Area

Perumal Koil Area

Gajalakshmi Nagar

Vembuli Amman Area

Sri Ram Nagar

Pachaiyappan Nagar

Sakthi Nagar

Pada Salai Street

This maintenance work follows a power shutdown in 45 locations across Chennai on Thursday. TANGEDCO has advised residents in the affected areas to plan accordingly and ensure necessary arrangements are made to cope with the temporary disruption.

Authorities have assured that the maintenance work is essential to improve the power infrastructure and ensure uninterrupted electricity supply in the future. 

Please follow and like us:

Leave a Comment

Your email address will not be published. Required fields are marked *

error

Enjoy this blog? Please spread the word :)

Scroll to Top